Case Study - Leading Medical Device Manufacturer Implements Advanced Plant Scheduling to Unlock Supply Chain Value

A leading global maker of medical devices had an ERP in place but did not have a formal plant planning and scheduling system to optimize detailed production workorders across a key plant. The planners relied on spreadsheets in a disjointed way to try to plan through and across plants. Without an intelligent planning and scheduling system, value was being lost each day with the lack of optimization.

To learn more, Download the Full Case Study